After the earthquake, the Qinghai Tibet Railway Company immediately organized human respectively on the tube of Lanzhou passenger dedicated section of Shiwan to the sea and hallgeir lines, bridges, tunnels, signals and other equipment comprehensive inspection, as of 21 May 10, the Qinghai Tibet railway line equipment inside the tube is normal, the trains were running. In order to ensure the absolute safety of railway transportation, Xining to Shiwan to the sea Hao door, hallgeir passenger train speed 120km/h operation.  

Leave a Reply

Your email address will not be published. Required fields are marked *